In 2013 the Workspace roof was removed and old ceiling insulation completely replaced. The old wool ceiling insulation was breaking up after 20 years of being installed and dropping particles onto tenant unit floors. All the Workspace roofs screws were completely replaced at the same time with heavy duty cyclone rated galvanized screws.
In 2015 the Workspace 8 roof ventilators were replaced, the roof was completely cleaned and washed. The Workspace roof was resprayed by local company Summerland Roofing.
Finished roof re-sprayed and roof ventilators.
Copyright © 2017 · All Rights Reserved · Evans Head & District Workspace Inc.